SITE-96 CLOSURE LOG

Site-96 Closure Log

Site-96 Closure Log

Blog Article

All operations related to the decommissioning of Site-96 have been concluded. The following report outlines the outcome of the procedure.

Staff were extracted from the site immediately following the triggering of the decommissioning protocol.

A complete survey of the site revealed undetectable collateral damage.

Further investigation is required to determine the long-term effects of the termination event.

A detailed documentation will be forwarded to relevant authorities upon finalization of these investigations.

Incident Record: Sector 96 - Contingency Protocol Beta

A full systemic breach has occurred at Site-96. The main anomaly is a dimensional distortion that appears to have compromised the physical integrity of the containment perimeter. All personnel are advised to immediately withdraw the site. Containment Protocol Omega is now in effect. Further details are pending analysis. Please await for further instructions.

Incident Log: Omega-10 - Personnel Disappearance

On [Date] at approximately 18:05, a report of personnel disappearance was logged. The missing individual, designated as Unit 47, last observed from the research facility during routine tasks. All initial security protocols were activated upon confirmation of the absence. A extensive search is ongoing within the designated perimeter, utilizing specialized teams. The reason behind the disappearance remains unknown, and investigations are currently underway to ascertain the full circumstances.

Sector-96 Security Protocols Revised

Effective forthwith, all personnel assigned to Sector-96 are required to adhere to the newly implemented security protocols. These revisions, prompted by recent events, aim to enhance the overall security posture of the facility and reduce the risk of intrusions. A comprehensive list of these revised protocols has been compiled in a document available through the secure server. All personnel shall familiarize themselves with the updated protocols and display their understanding during the mandatory briefing scheduled for shortly. Failure to adhere to these revised protocols will result in sanction up to and including decommissioning.

  • Moreover, any personnel observing a potential security threat must immediately report the head of security without delay.

Compliance with these revised protocols is imperative to maintaining the integrity and stability of Site-96.

Site 96 Anomaly Evaluation

This report details the mitigation strategies currently in effect at Site 96. The site is designated as a severe anomaly containment zone due to the presence of an unidentified anomalous entity (UAE). Initial reports suggest the UAE possesses reality warping potential.

Observations indicate a fluctuation in the anomaly's activity levels, with periods of unpredictable energy spikes}. This instability necessitates continuous monitoring and adaptation of site protocols. Further investigation is required to fully understand the nature and motivations of the UAE.

  • The primary objective is to prevent any further spreading of the anomaly outside designated containment zones..
  • {Pendingfuture research priorities|The procurement and implementation of specialized equipment for surveillance remain critical.|Cross-departmental collaboration between the researchteam and the securitypersonnel is essential to ensure a coordinated response.

Subject Recovery Attempt - Site-96

Initiating Protocol ALPHA-12. Primary containment breach confirmed at Zone Gamma. Subject presumed to be in disoriented condition. Deploying tactical personnel as first line of defense. Requesting full containment protocol activation.

  • Field Agent Alpha-7 reporting on subject's recent activity.
  • Reinforcement units requested for potential escalation scenario.

HQ Site 96 awaiting further reports. This is a developing situation.

Report this page