Site-96 Closure Log
All operations related to the decommissioning of Site-96 have been concluded. The following report outlines the outcome of the procedure. Staff were extracted from the site immediately following the triggering of the decommissioning protocol. A complete survey of the site revealed undetectable collateral damage. Further investigation is required